1. Purpose and Applicability

This policy sets out how Quality Asia Certifications Pvt. Ltd. will transition existing Privacy Information Management System (PIMS) clients from ISO/IEC 27701:2019 to ISO/IEC 27701:2025 and process new applications during the transition period. It applies to existing certified clients, new applicants and clients transferring their certification to Quality Asia.

2. References

ISO/IEC 27701:2025 — Privacy information management systems; NABCB Policy on Transition to ISO/IEC 27701:2025, issued 8 January 2026; and Quality Asia’s applicable application review, audit, certification decision and corrective action procedures.

3. Transition Deadline

All existing clients shall complete transition to ISO/IEC 27701:2025 by 31 December 2027. Completion includes the transition audit, satisfactory resolution of nonconformities, any required verification and a positive certification decision. An audit completed before the deadline alone does not constitute a successful transition.

4. Transition of Existing Clients

4.1 Quality Asia will communicate the transition requirements to existing clients and agree the transition audit arrangements. Transition may be combined with a scheduled surveillance or recertification audit, or undertaken through a special transition audit.

4.11 Quality Asia shall conduct a transition audit of additional 0.5 man-day by clubbing with the scheduled audit (Surveillance/ Reaccreditation as applicable) for verifying compliance to the requirements of ISO 27701:2025.

4.12 If this is planned as a separate audit, 1 man-day shall be considered for transition audit.

4.2 Clients shall obtain the revised standard, assess the changes, update their PIMS and relevant documented information, provide necessary personnel awareness and training, and retain evidence of effective implementation. Internal audit and management review shall address the revised requirements before the transition audit.

4.3 Clients shall submit their readiness confirmation and requested documentation to Quality Asia. Quality Asia will review the information, confirm the audit scope and plan, and assign personnel competent in the revised requirements.

4.4 Audits shall be scheduled sufficiently in advance of 31 December 2027 to allow time for corrective actions, verification and certification decisions. Existing surveillance and recertification obligations remain applicable throughout the transition period.

5. New Applications and Transfers

5.1 Following commencement of its accredited ISO/IEC 27701:2025 certification service, Quality Asia will accept new PIMS applications against ISO/IEC 27701:2025. The commencement date will be communicated to clients following the necessary accreditation authorization.

5.2 Pending ISO/IEC 27701:2019 applications will be reviewed with the applicant and converted to ISO/IEC 27701:2025 before certification wherever practicable. Any certification completed against the 2019 edition during the permitted transition period shall be subject to transition by 31 December 2027.

5.3 New applicants shall undergo the applicable initial certification process, including Stage 1 and Stage 2 audits and an independent certification decision. ISO/IEC 27701:2025 will be assessed as a standalone PIMS standard; the client’s scope and applicable PII controller and processor roles will be confirmed during application review.

5.4 Transfer applications will be subject to Quality Asia’s normal transfer review. Where a transferred certificate references ISO/IEC 27701:2019, the client shall also complete transition by 31 December 2027. Quality Asia will not accept applications or transfers against the 2019 edition after that date.

5.5 Quality Asia shall accept new applications for PIMS certification against ISO/IEC 27701:2019 up to 31 December 2026. From 1 January 2027, new applications for PIMS certification shall be accepted only against ISO/IEC 27701:2025.

6. Audit Duration and Findings

6.1 Quality Asia will determine the transition audit duration and any additional audit time through application or contract review, considering the PIMS scope, complexity, changes and applicable requirements. Audit duration, arrangements and charges will be communicated to the client before the audit.

6.2 The audit will verify conformity with ISO/IEC 27701:2025 and effective implementation of the changes. Nonconformities shall be classified and addressed under Quality Asia’s normal procedures. Corrective action evidence and any necessary follow up verification shall be completed before approval of transition; there is no blanket exemption from nonconformities during the transition period.

7. Certification and Failure to Transition

7.1 Following a positive certification decision, Quality Asia will issue a certificate referencing ISO/IEC 27701:2025. Transition during surveillance or through a special audit will retain the existing certification cycle. Transition combined with recertification will follow the normal recertification process.

7.2 ISO/IEC 27701:2019 certificates issued or reissued during transition shall expire no later than 31 December 2027, or their normal expiry date if earlier. A later date printed on an existing certificate shall not extend its validity beyond the transition deadline.

7.3 If transition is not successfully completed by 31 December 2027, certification to ISO/IEC 27701:2019 shall cease to be valid after that date. Quality Asia will notify affected clients, update their certification status and require discontinuation of claims and marks associated with the invalid certification.

8. Responsibility and Policy Review

The Certification Manager will coordinate communication, audit scheduling and monitoring of client transition. Quality Asia will communicate any changes arising from revised accreditation requirements. This policy remains applicable until completion of the transition programme.